One Zero Park

One Zero Park

A Meeting of the Minds for Science, Research, and Technology
{"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"false","loop":"true","nav_slide_column":5,"rtl":"false"}

DETAILS

Location, Seoul, Korea
ClientSamsung

Digital City is blessed with many assets that make it a special place in the Samsung family of campuses. Brilliant minds from around the world, an innovative environment, and an open space system in which the quality of work life is enhanced with play and relaxation. One Zero Park will be its center of spiritual gravity in which Samsung can host events and celebrations and demonstrate to the world its pride. One Zero Park is the place that, more than any other, reflects the quality of work life Samsung has promised its employees. A place of innovation, cross-fertilization, collaboration and inspiration; a wellness environment in which one can relax, meditate, exercise, communicate; in which one can connect with nature and the heritage of Digital City.

One Zero Park occupies the site of one of the technology world’s great success stories and Samsung’s R-1 campus. It is this rich heritage and Samsung’s push into the future from which we have drawn inspiration for the park concept. It is this place of origin and site for the birth of new ideas that has inspired the park plan.

Here at One Zero Park, the world’s greatest scientific, research, and technology minds will play, lunch, and sip tea in an environment that encourages the cross-fertilization of those burning half-baked ideas. This unique outdoor environment invites a viewing of “Ted” talks, or a seat in the woods or a group shelter for conferencing, or an urban picnic table outfitted for “lunch with laptops.” It is a place that attracts a collision of the creative orbits that each inquisitive Samsung mind travels.

The park we have conceived consists of tree-framed open space with large sunken court in which an open auditorium rests. The power and purity of this composition, natural green frame, open lawns and gardens, and iconic object will be immediately recognizable and memorable from above and at ground level.

Under the tree canopy promenade and in a strong graphic ground plane rests an array of pavement, public seating, shelters, semi-enclosed rooms, food kiosks, and other furnishings that foster social interaction along the sheltered park edges. The northern orbit path reaches beyond the frame to reinforce the park’s connection and relationship to R-3 and the Digital City park system.

Related Projects

Ferry Point Waterfront Park

Since the closing of a city-owned landfill in 1963, the site’s transformation into Ferry Point Waterfront Park has been a long, complex process. The new Ferry Point Waterfront Park will be a long linear eastern ecological extension of the previously built and conventionally programmed western Ferry Point Park. Part of a Jack Nicklaus-designed golf course, this...

Park 101

Description: SWA and John Kaliski Architects are providing landscape architectural and urban design services and advice to the Park 101 Phase 3 study, led by ELP Advisors. The study’s goal is to advance the project from the planning phase to the project implementation phase. SWA is an advisor on programming, design options, development, density, and managing t...

Nelson Mandela Park Master Plan

Identified by the City as one of its “Big Five” open space projects, the conceptual master plan for Nelson Mandela Park will create a much-needed central open space for the city’s south district, an industrial area along the waterfront that is home to a growing and increasingly diverse population. Here the city seeks to transcend its current park paradigm of l...

Bensonhurst Park

Bensonhurst Park is part of the larger Shore Parkway, an 816.1-acre collection of parks that stretches across Brooklyn and Queens. Today, the site provides a series of pathways, passive seating areas, recreational fields and a playground.

SWA/Balsley created a master plan for the redesign of the north end of the park and final design and construction do...

2020-01-06T19:38:22+00:00